Past consultations for the New Dacorum Local Plan
Revised Strategy for Growth consultation 2023
The consultation on the Dacorum Local Plan (2024-2040) Revised Strategy for Growth (PDF 4MB) ran between Monday 30 October 2023 and Monday 11 December 2023.
All comments, plus further information on the consultation, can be viewed on Let's Talk Dacorum.
Evidence documents
- Sustainability Appraisal (Interim SA Report) October 2023 (PDF 6MB)
- Sustainability Appraisal (Interim SA Report) Non-technical Summary October 2023 (PDF 2MB)
- Viability Update Main Report October 2023 (PDF 6MB)
- Viability Update Appendices October 2023 (PDF 4MB)
- Habitats Regulations Assessment September 2023 (PDF 7MB)
- Strategic Housing Land Availability Assessment Main Report October 2023 (PDF 1MB)
- Strategic Housing Land Availability Assessment Appendix A October 2023 (PDF 205KB)
- Strategic Housing Land Availability Assessment Appendix B October 2023 (PDF 9MB)
- Strategic Housing Land Availability Assessment Appendix C October 2023 (PDF 2MB)
- Strategic Housing Land Availability Assessment Interactive Map
- Hemel Garden Communities Position Statement October 2023 (PDF 5MB)
For more details on our evidence and technical studies previously undertaken, please visit our evidence base work for the new single Local Plan.
Emerging Strategy for Growth consultation 2020
In 2020, we asked you to have your say on our Emerging Strategy for Growth, a draft Local Plan. This was our previous phase of plan preparation and included sites proposed at that time and draft policies to deliver these and control other development within the borough.
Our consultation on the Emerging Strategy for Growth stage of the Local Plan took place between November 2020 and February 2021.
We have prepared a Consultation Summary Report (see Summary report and Appendices below) on the key issues raised and recommendations to take forward.
Appendix 1 - Emerging Strategy Consultation Summary Report (PDF 5.8MB)
Consultation Summary Report - Appendix 2a - Consultation points 3 to 5 (PDF 12MB)
Consultation Summary Report - Appendix 2b - Consultation points 6 to 12 (PDF 9MB)
Consultation Summary Report - Appendix 2c - Consultation points 14 to 22 (PDF 11MB)
Consultation Summary Report - Appendix 2d - Consultation point 23 - All Settlement Delivery Strategies (PDF 11MB)
Consultation Summary Report - Appendix 2e - Consultation point 24 - Hemel Hempstead and Berkhamsted Proposals and Sites (PDF 8MB)
Consultation Summary Report - Appendix 2f - Consultation point 24 - Tring to Countryside Proposals and Sites (PDF 10MB)
Consultation Summary Report - Appendix 2g - Consultation points 25 to 28 (PDF 12MB)
Dacorum Local Plan (2020-2038) Emerging Strategy for Growth documents
Part 1 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 1 to 187 (PDF 8MB)
Part 2 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 188 to 261 (PDF 4MB)
Part 3 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 262 to 297 (PDF 11MB)
Part 4 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 298 to 359 (PDF 11MB)
Local Plan Emerging Strategy for Growth 2020-2038 Draft Proposals Map (PDF 9MB)
Sustainability Appraisal documents
Dacorum Local Plan Interim Sustainability Appraisal Report - November 2020 (PDF 2MB)
Dacorum Local Plan Interim Sustainability Appraisal Report Appendices - November 2020 (PDF 4MB)
Dacorum Local Plan Interim Sustainability Appraisal Report - Non-Technical Summary - November 2020 (PDF 1MB)
Other supporting consultation documents
Local Plan Emerging Strategy for Growth 2020-2038 - Summary Document (PDF 4MB)
Local Plan Emerging Strategy for Growth Consultation FAQs and Supporting Information (PDF 10MB)
Issues and Options document consultation November 2017
In November 2017, extensive public consultation was carried out on the Issues and Options document - this looked at the challenges the borough faces to 2036, and options for how these could be addressed. A draft Sustainability Appraisal Working Note, which assessed the potential social, economic and environmental implications of the issues and options put forward, was also published for comment. Find out more about the Issue and Options consultation.
How we’ve been developing our Local Plan
The Plan has been informed by evidence and technical studies. For more details, please visit our evidence base work for the new single Local Plan.
Accessibility
Please note: some of our PDF documents may not be suitable for users of assistive technology. If you require them in a more accessible format, please email strategic.planning@dacorum.gov.uk and tell us what you need.
Page Last Updated: Wednesday, 02 October 2024 at 05:09 PM